OpenAlex Citation Counts

OpenAlex Citations Logo

OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!

If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.

Requested Article:

Contract bundling considerations in urban road project scheduling
Mohammad Miralinaghi, Amir Davatgari, Sania E. Seilabi, et al.
Computer-Aided Civil and Infrastructure Engineering (2021) Vol. 37, Iss. 4, pp. 427-450
Closed Access | Times Cited: 20

Showing 20 citing articles:

Key Decision-Making Factors Influencing Bundling Strategies: Analysis of Bundled Infrastructure Projects
Ghiwa Assaf, Rayan H. Assaad
Journal of Infrastructure Systems (2023) Vol. 29, Iss. 2
Closed Access | Times Cited: 32

A universal geography neural network for mobility flow prediction in planning scenarios
Jifu Guo, Shengguang Bai, Xun� Li, et al.
Computer-Aided Civil and Infrastructure Engineering (2025)
Open Access

Developing a Scoring Framework to Assess the Feasibility of the Design–Build Project Delivery Method for Bundled Projects
Ghiwa Assaf, Rayan H. Assaad
Journal of Management in Engineering (2024) Vol. 40, Iss. 6
Closed Access | Times Cited: 3

Identifying the Opportunities and Challenges of Project Bundling: Modeling and Discovering Key Patterns Using Unsupervised Machine Learning
Ghiwa Assaf, Rayan H. Assaad, Fadi A. Karaa
Journal of Infrastructure Systems (2024) Vol. 30, Iss. 1
Closed Access | Times Cited: 3

Segment‐condition‐based railway track maintenance schedule optimization
Yanyan Chang, Rengkui Liu, Yuanjie Tang
Computer-Aided Civil and Infrastructure Engineering (2022) Vol. 38, Iss. 2, pp. 160-193
Closed Access | Times Cited: 15

A methodology for scheduling within‐day roadway work zones using deep neural networks and active learning
Mostafa Saneii, Ali Kazemeini, Sania E. Seilabi, et al.
Computer-Aided Civil and Infrastructure Engineering (2022) Vol. 38, Iss. 9, pp. 1101-1126
Closed Access | Times Cited: 15

Mapping of State Transportation Agencies’ Practices and Perceptions in Project Bundling
Saurav Shrestha, Yongwei Shan, Paul M. Goodrum
Transportation Research Record Journal of the Transportation Research Board (2022) Vol. 2676, Iss. 7, pp. 597-607
Closed Access | Times Cited: 12

Scenario‐oriented repetitive project scheduling optimization
Zhiyuan Hu, Futian Wang, Yuanjie Tang
Computer-Aided Civil and Infrastructure Engineering (2022) Vol. 38, Iss. 10, pp. 1239-1273
Closed Access | Times Cited: 12

Construction and demolition waste disposal charging scheme design
Xinyuan Chen, Wen Yi, Hongping Yuan, et al.
Computer-Aided Civil and Infrastructure Engineering (2023) Vol. 39, Iss. 2, pp. 222-241
Open Access | Times Cited: 7

Analyzing the Critical Success Factors Affecting Project Bundling Performance of Infrastructure Projects
Ghiwa Assaf, Rayan H. Assaad
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 9
Closed Access | Times Cited: 2

Parking Infrastructure Location Design and User Pricing in the Prospective Era of Autonomous Vehicle Operations
Samuel Labi, Mostafa Saneii, Mahmood Tabesh, et al.
Journal of Infrastructure Systems (2023) Vol. 29, Iss. 4
Closed Access | Times Cited: 6

Identify Best Practices of Project Bundling for Highway Construction Projects
Saurav Shrestha, Yongwei Shan, Paul M. Goodrum
Construction Research Congress 2022 (2024), pp. 1-9
Closed Access | Times Cited: 1

365‐day sectional work zone schedule optimization for road networks considering economies of scale and user cost
Yuto Nakazato, Daijiro MIZUTANI
Computer-Aided Civil and Infrastructure Engineering (2024) Vol. 39, Iss. 15, pp. 2270-2298
Open Access | Times Cited: 1

A decision-support system for choosing between traditional and alternative project delivery methods for bundled projects
Ghiwa Assaf, Rayan H. Assaad
Engineering Construction & Architectural Management (2024)
Closed Access | Times Cited: 1

Reinforcement learning‐based approach for urban road project scheduling considering alternative closure types
Sania E. Seilabi, Mostafa Saneii, Mohammadhosein Pourgholamali, et al.
Computer-Aided Civil and Infrastructure Engineering (2024)
Open Access | Times Cited: 1

Identification of Best Practices in Project Bundling for State DOTs Using Semistructured Interviews
Saurav Shrestha, Yongwei Shan, Paul M. Goodrum
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 7
Closed Access

A Data-Driven Decision-Support Tool for Selecting the Optimal Project Delivery Method for Bundled Projects: Integrating Machine Learning and Expert Domain Knowledge
Ghiwa Assaf, Rayan H. Assaad
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 12
Closed Access

Design and Management of Highway Infrastructure to Accommodate CAVs
Samuel Labi, Tariq Usman Saeed, Mohammadhosein Pourgholamali, et al.
(2024)
Open Access

Network-level pavement maintenance and rehabilitation decision-making with the optimized annual budget
Lin Chen
PLoS ONE (2023) Vol. 18, Iss. 10, pp. e0287426-e0287426
Open Access | Times Cited: 1

Total Road Closure Vs. Partial Closure – Insights for Road Project Scheduling Using a Reinforcement Learning-Based Approach
Sania E. Seilabi, Mostafa Saneii, Mohammadhosein Pourgholamali, et al.
SSRN Electronic Journal (2022)
Closed Access | Times Cited: 1

Page 1

Scroll to top