
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
RFID Enabled Knowledge‐Based Precast Construction Supply Chain
Zhaojing Wang, Hao Hu, Wei Zhou
Computer-Aided Civil and Infrastructure Engineering (2017) Vol. 32, Iss. 6, pp. 499-514
Closed Access | Times Cited: 77
Zhaojing Wang, Hao Hu, Wei Zhou
Computer-Aided Civil and Infrastructure Engineering (2017) Vol. 32, Iss. 6, pp. 499-514
Closed Access | Times Cited: 77
Showing 1-25 of 77 citing articles:
Blockchain-based framework for improving supply chain traceability and information sharing in precast construction
Zhaojing Wang, Tengyu Wang, Hao Hu, et al.
Automation in Construction (2019) Vol. 111, pp. 103063-103063
Closed Access | Times Cited: 394
Zhaojing Wang, Tengyu Wang, Hao Hu, et al.
Automation in Construction (2019) Vol. 111, pp. 103063-103063
Closed Access | Times Cited: 394
Blockchain: case studies in food supply chain visibility
Michael Rogerson, Glenn Parry
Supply Chain Management An International Journal (2020) Vol. 25, Iss. 5, pp. 601-614
Open Access | Times Cited: 323
Michael Rogerson, Glenn Parry
Supply Chain Management An International Journal (2020) Vol. 25, Iss. 5, pp. 601-614
Open Access | Times Cited: 323
A Systematic Review of Digital Technology Adoption in Off-Site Construction: Current Status and Future Direction towards Industry 4.0
Mudan Wang, Cynthia Wang, Samad M. E. Sepasgozar, et al.
Buildings (2020) Vol. 10, Iss. 11, pp. 204-204
Open Access | Times Cited: 255
Mudan Wang, Cynthia Wang, Samad M. E. Sepasgozar, et al.
Buildings (2020) Vol. 10, Iss. 11, pp. 204-204
Open Access | Times Cited: 255
Novel Machine-Learning Model for Estimating Construction Costs Considering Economic Variables and Indexes
Mohammad Hossein Rafiei, Hojjat Adeli
Journal of Construction Engineering and Management (2018) Vol. 144, Iss. 12
Closed Access | Times Cited: 211
Mohammad Hossein Rafiei, Hojjat Adeli
Journal of Construction Engineering and Management (2018) Vol. 144, Iss. 12
Closed Access | Times Cited: 211
Inkjet printed nanomaterial based flexible radio frequency identification (RFID) tag sensors for the internet of nano things
Ravina Singh, Eric J. Singh, Hari Singh Nalwa
RSC Advances (2017) Vol. 7, Iss. 77, pp. 48597-48630
Open Access | Times Cited: 188
Ravina Singh, Eric J. Singh, Hari Singh Nalwa
RSC Advances (2017) Vol. 7, Iss. 77, pp. 48597-48630
Open Access | Times Cited: 188
Cloud asset-enabled integrated IoT platform for lean prefabricated construction
Gangyan Xu, Ming Li, Chun‐Hsien Chen, et al.
Automation in Construction (2018) Vol. 93, pp. 123-134
Closed Access | Times Cited: 167
Gangyan Xu, Ming Li, Chun‐Hsien Chen, et al.
Automation in Construction (2018) Vol. 93, pp. 123-134
Closed Access | Times Cited: 167
Modelling in off-site construction supply chain management: A review and future directions for sustainable modular integrated construction
Mohamed Hussein, Abdelrahman E. E. Eltoukhy, Ahmed Karam, et al.
Journal of Cleaner Production (2021) Vol. 310, pp. 127503-127503
Open Access | Times Cited: 134
Mohamed Hussein, Abdelrahman E. E. Eltoukhy, Ahmed Karam, et al.
Journal of Cleaner Production (2021) Vol. 310, pp. 127503-127503
Open Access | Times Cited: 134
An overall review of research on prefabricated construction supply chain management
Yanhu Han, Xiyu Yan, Poorang Piroozfar
Engineering Construction & Architectural Management (2022) Vol. 30, Iss. 10, pp. 5160-5195
Open Access | Times Cited: 83
Yanhu Han, Xiyu Yan, Poorang Piroozfar
Engineering Construction & Architectural Management (2022) Vol. 30, Iss. 10, pp. 5160-5195
Open Access | Times Cited: 83
RFID-integrated blockchain-driven circular supply chain management: A system architecture for B2B tea industry
Tripti Paul, Nazrul Islam, Sandeep Mondal, et al.
Industrial Marketing Management (2022) Vol. 101, pp. 238-257
Open Access | Times Cited: 79
Tripti Paul, Nazrul Islam, Sandeep Mondal, et al.
Industrial Marketing Management (2022) Vol. 101, pp. 238-257
Open Access | Times Cited: 79
Exploration in carbon emission reduction effect of low-carbon practices in prefabricated building supply chain
Xiaoyan Wang, Qiang Du, Cheng Lu, et al.
Journal of Cleaner Production (2022) Vol. 368, pp. 133153-133153
Closed Access | Times Cited: 70
Xiaoyan Wang, Qiang Du, Cheng Lu, et al.
Journal of Cleaner Production (2022) Vol. 368, pp. 133153-133153
Closed Access | Times Cited: 70
Artificial intelligence for production, operations and logistics management in modular construction industry: A systematic literature review
Qiurui Liu, Yanfang Ma, Lin Chen, et al.
Information Fusion (2024) Vol. 109, pp. 102423-102423
Closed Access | Times Cited: 16
Qiurui Liu, Yanfang Ma, Lin Chen, et al.
Information Fusion (2024) Vol. 109, pp. 102423-102423
Closed Access | Times Cited: 16
Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components
Zhaojing Wang, Hao Hu, Jie Gong
Automation in Construction (2017) Vol. 86, pp. 69-80
Closed Access | Times Cited: 135
Zhaojing Wang, Hao Hu, Jie Gong
Automation in Construction (2017) Vol. 86, pp. 69-80
Closed Access | Times Cited: 135
Precast supply chain management in off-site construction: A critical literature review
Zhaojing Wang, Hao Hu, Jie Gong, et al.
Journal of Cleaner Production (2019) Vol. 232, pp. 1204-1217
Closed Access | Times Cited: 125
Zhaojing Wang, Hao Hu, Jie Gong, et al.
Journal of Cleaner Production (2019) Vol. 232, pp. 1204-1217
Closed Access | Times Cited: 125
A framework for data-driven informatization of the construction company
Zhijia You, Chen Wu
Advanced Engineering Informatics (2019) Vol. 39, pp. 269-277
Closed Access | Times Cited: 91
Zhijia You, Chen Wu
Advanced Engineering Informatics (2019) Vol. 39, pp. 269-277
Closed Access | Times Cited: 91
The impact of blockchain technology on the tea supply chain and its sustainable performance
Tripti Paul, Sandeep Mondal, Nazrul Islam, et al.
Technological Forecasting and Social Change (2021) Vol. 173, pp. 121163-121163
Open Access | Times Cited: 91
Tripti Paul, Sandeep Mondal, Nazrul Islam, et al.
Technological Forecasting and Social Change (2021) Vol. 173, pp. 121163-121163
Open Access | Times Cited: 91
Critical factors influencing carbon emissions of prefabricated building supply chains in China
Qiang Du, Qiaoyu Pang, Tana Bao, et al.
Journal of Cleaner Production (2020) Vol. 280, pp. 124398-124398
Closed Access | Times Cited: 84
Qiang Du, Qiaoyu Pang, Tana Bao, et al.
Journal of Cleaner Production (2020) Vol. 280, pp. 124398-124398
Closed Access | Times Cited: 84
Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies
Qian Chen, Bryan T. Adey, Carl T. Haas, et al.
Construction Innovation (2020) Vol. 20, Iss. 3, pp. 471-508
Closed Access | Times Cited: 76
Qian Chen, Bryan T. Adey, Carl T. Haas, et al.
Construction Innovation (2020) Vol. 20, Iss. 3, pp. 471-508
Closed Access | Times Cited: 76
A Conceptual Development Framework for Prefabricated Construction Supply Chain Management: An Integrated Overview
Liu Yang, Jianjun Dong, Ling Shen
Sustainability (2020) Vol. 12, Iss. 5, pp. 1878-1878
Open Access | Times Cited: 72
Liu Yang, Jianjun Dong, Ling Shen
Sustainability (2020) Vol. 12, Iss. 5, pp. 1878-1878
Open Access | Times Cited: 72
Automating the modular construction process: A review of digital technologies and future directions with blockchain technology
Timothy O. Olawumi, Daniel W.M. Chan, Stephen Ojo, et al.
Journal of Building Engineering (2021) Vol. 46, pp. 103720-103720
Open Access | Times Cited: 68
Timothy O. Olawumi, Daniel W.M. Chan, Stephen Ojo, et al.
Journal of Building Engineering (2021) Vol. 46, pp. 103720-103720
Open Access | Times Cited: 68
Towards Industrial Revolution 5.0 and Explainable Artificial Intelligence: Challenges and Opportunities
Imran Taj, N. Z. Jhanjhi
International Journal of Computing and Digital Systems (2022) Vol. 12, Iss. 1, pp. 295-320
Open Access | Times Cited: 61
Imran Taj, N. Z. Jhanjhi
International Journal of Computing and Digital Systems (2022) Vol. 12, Iss. 1, pp. 295-320
Open Access | Times Cited: 61
State-of-the-Art Review of Blockchain-Enabled Construction Supply Chain
Jong Han Yoon, Pardis Pishdad-Bozorgi
Journal of Construction Engineering and Management (2021) Vol. 148, Iss. 2
Closed Access | Times Cited: 60
Jong Han Yoon, Pardis Pishdad-Bozorgi
Journal of Construction Engineering and Management (2021) Vol. 148, Iss. 2
Closed Access | Times Cited: 60
Towards Industrial Revolution 5.0 and Explainable Artificial Intelligence: Challenges and Opportunities
Imran Taj, Noor Zaman
International Journal of Computing and Digital Systems (2022) Vol. 12, Iss. 1, pp. 285-310
Open Access | Times Cited: 40
Imran Taj, Noor Zaman
International Journal of Computing and Digital Systems (2022) Vol. 12, Iss. 1, pp. 285-310
Open Access | Times Cited: 40
Digital twin for intelligent tunnel construction
Tao Li, Xiaojun Li, Yi Rui, et al.
Automation in Construction (2023) Vol. 158, pp. 105210-105210
Closed Access | Times Cited: 38
Tao Li, Xiaojun Li, Yi Rui, et al.
Automation in Construction (2023) Vol. 158, pp. 105210-105210
Closed Access | Times Cited: 38
Multistage self-adaptive decision-making mechanism for prefabricated building modules with IoT-enabled graduation manufacturing system
Haoran Ding, Mingxing Li, Ray Y. Zhong, et al.
Automation in Construction (2023) Vol. 148, pp. 104755-104755
Closed Access | Times Cited: 22
Haoran Ding, Mingxing Li, Ray Y. Zhong, et al.
Automation in Construction (2023) Vol. 148, pp. 104755-104755
Closed Access | Times Cited: 22
A review on the interactions of robotic systems and lean principles in offsite construction
Sara Gusmão Brissi, Oscar Wong Chong, Luciana Debs, et al.
Engineering Construction & Architectural Management (2021) Vol. 29, Iss. 1, pp. 383-406
Closed Access | Times Cited: 48
Sara Gusmão Brissi, Oscar Wong Chong, Luciana Debs, et al.
Engineering Construction & Architectural Management (2021) Vol. 29, Iss. 1, pp. 383-406
Closed Access | Times Cited: 48