
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation–Driven Approach
Tamima Elbashbishy, Ossama Hosny, Ahmed F. Waly, et al.
Journal of Management in Engineering (2022) Vol. 38, Iss. 6
Closed Access | Times Cited: 16
Tamima Elbashbishy, Ossama Hosny, Ahmed F. Waly, et al.
Journal of Management in Engineering (2022) Vol. 38, Iss. 6
Closed Access | Times Cited: 16
Showing 16 citing articles:
Knowledge Graph Improved Dynamic Risk Analysis Method for Behavior-Based Safety Management on a Construction Site
Q. H. Chen, Danbing Long, Cheng Yang, et al.
Journal of Management in Engineering (2023) Vol. 39, Iss. 4
Closed Access | Times Cited: 26
Q. H. Chen, Danbing Long, Cheng Yang, et al.
Journal of Management in Engineering (2023) Vol. 39, Iss. 4
Closed Access | Times Cited: 26
Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects
Yasir Alhammadi, Mohammad S. Al-Mohammad, Rahimi A. Rahman
Buildings (2024) Vol. 14, Iss. 2, pp. 487-487
Open Access | Times Cited: 11
Yasir Alhammadi, Mohammad S. Al-Mohammad, Rahimi A. Rahman
Buildings (2024) Vol. 14, Iss. 2, pp. 487-487
Open Access | Times Cited: 11
Identification of Key Safety Risk Factors and Coupling Paths in Mega Construction Projects
Pengcheng Xiang, Yingliu Yang, Kesheng Yan, et al.
Journal of Management in Engineering (2024) Vol. 40, Iss. 4
Closed Access | Times Cited: 7
Pengcheng Xiang, Yingliu Yang, Kesheng Yan, et al.
Journal of Management in Engineering (2024) Vol. 40, Iss. 4
Closed Access | Times Cited: 7
Primary Risks for Delays and Cost Overruns in the Construction of Drinking Water Supply and Sanitation Projects in Peru
Carlos Julca-Varas, Tatiana García-Segura, Cristina Torres-Machí, et al.
Journal of Management in Engineering (2025) Vol. 41, Iss. 3
Closed Access
Carlos Julca-Varas, Tatiana García-Segura, Cristina Torres-Machí, et al.
Journal of Management in Engineering (2025) Vol. 41, Iss. 3
Closed Access
Assessing construction safety risks in large urban complex projects: an interval ordinal priority approach
Linlin Xie, Ziyi Yu, Xianbo Zhao
Engineering Construction & Architectural Management (2025)
Closed Access
Linlin Xie, Ziyi Yu, Xianbo Zhao
Engineering Construction & Architectural Management (2025)
Closed Access
Configuration path identification of investment risk in C hina's overseas energy projects: An exploration based on LDA and fsQCA
Haonan Chen, Anxia Wan, Benhong Peng
Environmental Progress & Sustainable Energy (2025)
Closed Access
Haonan Chen, Anxia Wan, Benhong Peng
Environmental Progress & Sustainable Energy (2025)
Closed Access
Predicting the Cost Outcome of Construction Quality Problems Using Case-Based Reasoning (CBR)
Neşet Berkay Doğan, Bilal Umut Ayhan, Gökhan Kazar, et al.
Buildings (2022) Vol. 12, Iss. 11, pp. 1946-1946
Open Access | Times Cited: 13
Neşet Berkay Doğan, Bilal Umut Ayhan, Gökhan Kazar, et al.
Buildings (2022) Vol. 12, Iss. 11, pp. 1946-1946
Open Access | Times Cited: 13
Defining the Success Status of Construction Projects Based on Quantitative Performance Metrics Thresholds
Eyad Aboseif, Awad S. Hanna
Journal of Management in Engineering (2022) Vol. 39, Iss. 2
Closed Access | Times Cited: 11
Eyad Aboseif, Awad S. Hanna
Journal of Management in Engineering (2022) Vol. 39, Iss. 2
Closed Access | Times Cited: 11
A BIM Package with NEC4 Contract Option to Mitigate Construction Disputes in the Kingdom of Saudi Arabia
Reda Abdelshafy Abougamil, David Thorpe, Amirhossein Heravi
(2024)
Open Access | Times Cited: 1
Reda Abdelshafy Abougamil, David Thorpe, Amirhossein Heravi
(2024)
Open Access | Times Cited: 1
Barriers to the implementation of enterprise risk management in Indian construction firms
Anand Prakash, Sudhir Ambekar
Construction Innovation (2024)
Closed Access | Times Cited: 1
Anand Prakash, Sudhir Ambekar
Construction Innovation (2024)
Closed Access | Times Cited: 1
A BIM Package with a NEC4 Contract Option to Mitigate Construction Disputes in the Kingdom of Saudi Arabia
Reda Abdelshafy Abougamil, David Thorpe, Amirhossein Heravi
Buildings (2024) Vol. 14, Iss. 7, pp. 2009-2009
Open Access | Times Cited: 1
Reda Abdelshafy Abougamil, David Thorpe, Amirhossein Heravi
Buildings (2024) Vol. 14, Iss. 7, pp. 2009-2009
Open Access | Times Cited: 1
Benchmarking of construction projects performance for comparative assessment and performance improvement: a statistical quantitative approach
Eyad Aboseif, Awad S. Hanna
Engineering Construction & Architectural Management (2023) Vol. 31, Iss. 7, pp. 2829-2851
Closed Access | Times Cited: 2
Eyad Aboseif, Awad S. Hanna
Engineering Construction & Architectural Management (2023) Vol. 31, Iss. 7, pp. 2829-2851
Closed Access | Times Cited: 2
Employee perspectives on risk management in a construction company
Önder Ökmen, Martijn Leijten, Theodora Stratton, et al.
Journal of Risk Research (2024) Vol. 27, Iss. 3, pp. 404-422
Open Access
Önder Ökmen, Martijn Leijten, Theodora Stratton, et al.
Journal of Risk Research (2024) Vol. 27, Iss. 3, pp. 404-422
Open Access
Explaining Cost Overrun Causation in Transport Projects: Drawing on Evidential Pluralism to Develop Theory
Peter E.D. Love
Journal of Construction Engineering and Management (2024) Vol. 151, Iss. 2
Closed Access
Peter E.D. Love
Journal of Construction Engineering and Management (2024) Vol. 151, Iss. 2
Closed Access
Sensitivity of Cost Overrun Propensity and Severity to Highway Project Bundling
Yu Qiao, Abdullah Nafakh, Majed Alinizzi, et al.
Journal of Management in Engineering (2023) Vol. 40, Iss. 2
Closed Access | Times Cited: 1
Yu Qiao, Abdullah Nafakh, Majed Alinizzi, et al.
Journal of Management in Engineering (2023) Vol. 40, Iss. 2
Closed Access | Times Cited: 1
DETERMINANTS OF DESIGN AND BUILD CONSTRUCTION PROJECTS OF LAHORE DEVELOPMENT AUTHORITY: DOES THE PROJECT COST MATTER?
Muhammad Awais
THE ASIAN BULLETIN OF BUSINESS AND SOCIAL SCIENCE RESEARCH (2022) Vol. 2, Iss. 1, pp. 1-13
Open Access
Muhammad Awais
THE ASIAN BULLETIN OF BUSINESS AND SOCIAL SCIENCE RESEARCH (2022) Vol. 2, Iss. 1, pp. 1-13
Open Access