If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.

Requested Article:

Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting
Seyed Hossein Hashemi Doulabi, Abbas Seifi, Seyed Yasser Shariat
Journal of Construction Engineering and Management (2010) Vol. 137, Iss. 2, pp. 137-146
Closed Access | Times Cited: 48

Showing 1-25 of 48 citing articles:

Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search
Min‐Yuan Cheng, Doddy Prayogo, Duc-Hoc Tran
Journal of Computing in Civil Engineering (2015) Vol. 30, Iss. 3
Closed Access | Times Cited: 110

Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
Jia Liu, Yi‐Sheng Liu, Ying Shi, et al.
Journal of Computing in Civil Engineering (2019) Vol. 34, Iss. 2
Closed Access | Times Cited: 64

A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting
Ali RezaHoseini, Seyed Farid Ghannadpour, Maryam Hemmati
Journal of Cleaner Production (2020) Vol. 269, pp. 122073-122073
Closed Access | Times Cited: 44

Resource Leveling in Line‐of‐Balance Scheduling
Atilla Damcı, David Arditi, Gül Polat
Computer-Aided Civil and Infrastructure Engineering (2013) Vol. 28, Iss. 9, pp. 679-692
Open Access | Times Cited: 54

Scheduling Optimization of Linear Schedule with Constraint Programming
Yuanjie Tang, Rengkui Liu, Futian Wang, et al.
Computer-Aided Civil and Infrastructure Engineering (2017) Vol. 33, Iss. 2, pp. 124-151
Closed Access | Times Cited: 44

Multiresource Leveling in Line-of-Balance Scheduling
Atilla Damcı, David Arditi, Gül Polat
Journal of Construction Engineering and Management (2013) Vol. 139, Iss. 9, pp. 1108-1116
Closed Access | Times Cited: 41

IMPACTS OF DIFFERENT OBJECTIVE FUNCTIONS ON RESOURCE LEVELING IN CONSTRUCTION PROJECTS: A CASE STUDY
Atilla Damcı, Gül Polat
Journal of Civil Engineering and Management (2014) Vol. 20, Iss. 4, pp. 537-547
Open Access | Times Cited: 37

A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags
José Luis Ponz‐Tienda, Alejandro Salcedo-Bernal, Eugenio Pellicer
Computer-Aided Civil and Infrastructure Engineering (2016) Vol. 32, Iss. 6, pp. 474-498
Open Access | Times Cited: 37

Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning
Ming-Fung Francis Siu, Ming Lu, Simaan AbouRizk
Journal of Construction Engineering and Management (2015) Vol. 142, Iss. 1
Closed Access | Times Cited: 29

Resource levelling problem in construction projects under neutrosophic environment
Mohamed Abdel‐Basset, Mumtaz Ali, Asma Atef
The Journal of Supercomputing (2019) Vol. 76, Iss. 2, pp. 964-988
Closed Access | Times Cited: 27

Scheduling Policies for the Stochastic Resource Leveling Problem
Hongbo Li, Zhe Xu, Erik Demeulemeester
Journal of Construction Engineering and Management (2014) Vol. 141, Iss. 2
Closed Access | Times Cited: 27

Impacts of different objective functions on resource leveling in Line-of-Balance scheduling
Atilla Damcı, David Arditi, Gül Polat
KSCE Journal of Civil Engineering (2015) Vol. 20, Iss. 1, pp. 58-67
Closed Access | Times Cited: 26

Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project
Lihua He, Lianying Zhang
Journal of the Operational Research Society (2013) Vol. 64, Iss. 8, pp. 1106-1117
Closed Access | Times Cited: 23

Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimization
S. Madeh Piryonesi, Mehran Nasseri, Abdollah Ramezani
Canadian Journal of Civil Engineering (2018) Vol. 46, Iss. 2, pp. 81-86
Open Access | Times Cited: 23

Using Fuzzy Clustering Chaotic-based Differential Evolution to solve multiple resources leveling in the multiple projects scheduling problem
Duc-Hoc Tran, Min‐Yuan Cheng, Anh‐Duc Pham
Alexandria Engineering Journal (2016) Vol. 55, Iss. 2, pp. 1541-1552
Open Access | Times Cited: 20

FUZZY CLUSTERING CHAOTIC-BASED DIFFERENTIAL EVOLUTION FOR RESOURCE LEVELING IN CONSTRUCTION PROJECTS
Min‐Yuan Cheng, Duc-Hoc Tran, Nhat‐Duc Hoang
Journal of Civil Engineering and Management (2016) Vol. 23, Iss. 1, pp. 113-124
Open Access | Times Cited: 20

Developing an optimization financing cost-scheduling trade-off model in construction project
Mehdi Tavakolan, Shayan Nikoukar
International Journal of Construction Management (2019) Vol. 22, Iss. 2, pp. 262-277
Closed Access | Times Cited: 17

Automated Real-Time Monitoring System to Measure Shift Production of Tunnel Construction Projects
Kamal Ranaweera, Janaka Y. Ruwanpura, Siri Fernando
Journal of Computing in Civil Engineering (2012) Vol. 27, Iss. 1, pp. 68-77
Closed Access | Times Cited: 20

A Novel Resource-Leveling Approach for Construction Project Based on Differential Evolution
Hong-Hai Tran, Nhat‐Duc Hoang
Journal of Construction Engineering (2014) Vol. 2014, pp. 1-7
Open Access | Times Cited: 16

Float-Based Resource Leveling Optimization of Linear Projects
Ziteng Wang, Zhiyuan Hu, Yuanjie Tang
IEEE Access (2020) Vol. 8, pp. 176997-177020
Open Access | Times Cited: 12

A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint
Qingyou Yan, Qian Zhang, Xin Zou
Discrete Dynamics in Nature and Society (2016) Vol. 2016, pp. 1-8
Open Access | Times Cited: 8

Optimization of resource leveling problem under multiple objective criteria using a symbiotic organisms search
Doddy Prayogo, Christianto Tirta Kusuma
Civil Engineering Dimension (2019) Vol. 21, Iss. 1, pp. 43-51
Open Access | Times Cited: 8

Allocation of construction resources through a pull‐driven approach
S. Thomas Ng, Daisy X. M. Zheng, Jessie Z. Xie
Construction Innovation (2013) Vol. 13, Iss. 1, pp. 77-97
Closed Access | Times Cited: 7

Use of float consumption rate in resource leveling of construction projects
Atilla Damcı, Gül Polat, Fırat Doğu Akın, et al.
Frontiers of Engineering Management (2020) Vol. 9, Iss. 1, pp. 135-147
Closed Access | Times Cited: 7

A Memetic Algorithm for the Solution of the Resource Leveling Problem
Mehdi Iranagh, Rifat Sönmez, Tankut Atan, et al.
Buildings (2023) Vol. 13, Iss. 11, pp. 2738-2738
Open Access | Times Cited: 2