
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
Supplier development in a two-level lot sizing problem with non-conforming items and learning
Walid W. Nasr, Mohamad Y. Jaber
International Journal of Production Economics (2019) Vol. 216, pp. 349-363
Closed Access | Times Cited: 10
Walid W. Nasr, Mohamad Y. Jaber
International Journal of Production Economics (2019) Vol. 216, pp. 349-363
Closed Access | Times Cited: 10
Showing 10 citing articles:
Predicting human reliability based on probabilistic mission completion time using Bayesian Network
N. Asadayoobi, Sharareh Taghipour, Mohamad Y. Jaber
Reliability Engineering & System Safety (2022) Vol. 221, pp. 108324-108324
Closed Access | Times Cited: 33
N. Asadayoobi, Sharareh Taghipour, Mohamad Y. Jaber
Reliability Engineering & System Safety (2022) Vol. 221, pp. 108324-108324
Closed Access | Times Cited: 33
A two-level closed-loop supply chain under the constract Of vendor managed inventory with learning: a novel hybrid algorithm
Lily Poursoltan, Seyed Mohammad Seyedhosseini, Armin Jabbarzadeh
Journal of Industrial and Production Engineering (2021) Vol. 38, Iss. 4, pp. 254-270
Closed Access | Times Cited: 28
Lily Poursoltan, Seyed Mohammad Seyedhosseini, Armin Jabbarzadeh
Journal of Industrial and Production Engineering (2021) Vol. 38, Iss. 4, pp. 254-270
Closed Access | Times Cited: 28
Optimizing a two-level closed-loop supply chain under the vendor managed inventory contract and learning: Fibonacci, GA, IWO, MFO algorithms
Fatemeh Keshavarz-Ghorbani, Seyed Hamid Reza Pasandideh
Neural Computing and Applications (2021) Vol. 33, Iss. 15, pp. 9425-9450
Closed Access | Times Cited: 17
Fatemeh Keshavarz-Ghorbani, Seyed Hamid Reza Pasandideh
Neural Computing and Applications (2021) Vol. 33, Iss. 15, pp. 9425-9450
Closed Access | Times Cited: 17
An Extension to the Economic Production Quantity Problem with Deteriorating Products Considering Random Machine Breakdown and Stochastic Repair Time
Lily Poursoltan, Seyed Mohammad Seyedhosseini, Armin Jabbarzadeh
International journal of engineering. Transactions B: Applications (2020) Vol. 33, Iss. 8
Open Access | Times Cited: 7
Lily Poursoltan, Seyed Mohammad Seyedhosseini, Armin Jabbarzadeh
International journal of engineering. Transactions B: Applications (2020) Vol. 33, Iss. 8
Open Access | Times Cited: 7
Supplier switching versus supplier development under risk: A mathematical modelling approach
Mahdi Jafarian, Mohammad Mehdi Lotfi, Mir Saman Pishvaee
Computers & Industrial Engineering (2021) Vol. 162, pp. 107737-107737
Closed Access | Times Cited: 5
Mahdi Jafarian, Mohammad Mehdi Lotfi, Mir Saman Pishvaee
Computers & Industrial Engineering (2021) Vol. 162, pp. 107737-107737
Closed Access | Times Cited: 5
Human Performance Modelling and Mission Planning Optimisation incorporating Human Performance
Negin Asadayoobi
(2024)
Open Access
Negin Asadayoobi
(2024)
Open Access
Human Performance Modelling and Mission Planning Optimisation incorporating Human Performance
Negin Asadayoobi
(2024)
Open Access
Negin Asadayoobi
(2024)
Open Access
The effects of dynamic learning and the forgetting process on an optimising modelling for full-service repair pricing contracts for medical devices
Aiping Jiang, Lin Li, Xuemin Xu, et al.
Journal of the Operational Research Society (2024) Vol. 75, Iss. 10, pp. 1910-1924
Closed Access
Aiping Jiang, Lin Li, Xuemin Xu, et al.
Journal of the Operational Research Society (2024) Vol. 75, Iss. 10, pp. 1910-1924
Closed Access
Role of supplier evaluation criteria in risk mitigation related to purchasing process
Maciej Urbaniak
Engineering Management in Production and Services (2021) Vol. 13, Iss. 2, pp. 96-106
Open Access | Times Cited: 2
Maciej Urbaniak
Engineering Management in Production and Services (2021) Vol. 13, Iss. 2, pp. 96-106
Open Access | Times Cited: 2
A Vendor Managed Inventory with FIFO and LIFO Plans
Yui‐yip Lau, Arash Mazaheri
Journal of Research in Science Engineering and Technology (2021) Vol. 8, Iss. 4, pp. 19-35
Open Access | Times Cited: 1
Yui‐yip Lau, Arash Mazaheri
Journal of Research in Science Engineering and Technology (2021) Vol. 8, Iss. 4, pp. 19-35
Open Access | Times Cited: 1