
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
A heuristic rule adaptive selection approach for multi-work package project scheduling problem
Yaning Zhang, Xiao Li, Yue Teng, et al.
Expert Systems with Applications (2023) Vol. 238, pp. 122092-122092
Closed Access | Times Cited: 8
Yaning Zhang, Xiao Li, Yue Teng, et al.
Expert Systems with Applications (2023) Vol. 238, pp. 122092-122092
Closed Access | Times Cited: 8
Showing 8 citing articles:
Proof of Carbon Reduction: A Novel Incentive Mechanism in Blockchain for Carbon Emissions Reduction in Construction
Juan Wang, Xiao Li, Chen Chen, et al.
Building and Environment (2025) Vol. 272, pp. 112684-112684
Closed Access
Juan Wang, Xiao Li, Chen Chen, et al.
Building and Environment (2025) Vol. 272, pp. 112684-112684
Closed Access
A Hybrid and Intuitive Work Packaging Approach with Multiple Task Relations, General Work Package Precedence, and BIM in Modular Construction
Zisheng Liu, Xiao Li, Zhiwei Gao, et al.
Journal of Construction Engineering and Management (2025) Vol. 151, Iss. 4
Closed Access
Zisheng Liu, Xiao Li, Zhiwei Gao, et al.
Journal of Construction Engineering and Management (2025) Vol. 151, Iss. 4
Closed Access
A two-stage adjustable robust optimization approach for multi-work package project scheduling problem under uncertain environments
H Michael Zhang, Lubo Li, Erik Demeulemeester, et al.
Journal of the Operational Research Society (2025), pp. 1-17
Closed Access
H Michael Zhang, Lubo Li, Erik Demeulemeester, et al.
Journal of the Operational Research Society (2025), pp. 1-17
Closed Access
Two-list genetic algorithm for optimizing work package schemes to minimize project costs
Yaning Zhang, Xiao Li, Yue Teng, et al.
Automation in Construction (2024) Vol. 165, pp. 105595-105595
Closed Access | Times Cited: 3
Yaning Zhang, Xiao Li, Yue Teng, et al.
Automation in Construction (2024) Vol. 165, pp. 105595-105595
Closed Access | Times Cited: 3
Automated construction scheduling using deep reinforcement learning with valid action sampling
Yuan Yao, Vivian W.Y. Tam, Jun Wang, et al.
Automation in Construction (2024) Vol. 166, pp. 105622-105622
Open Access | Times Cited: 3
Yuan Yao, Vivian W.Y. Tam, Jun Wang, et al.
Automation in Construction (2024) Vol. 166, pp. 105622-105622
Open Access | Times Cited: 3
A joint work package sizing and scheduling problem considering resource constraints with a look-ahead heterogeneous reinforcement learning method
Nianmin Zhang, Xiaolu Li, Gao Yao
International Journal of Production Research (2024), pp. 1-38
Closed Access | Times Cited: 1
Nianmin Zhang, Xiaolu Li, Gao Yao
International Journal of Production Research (2024), pp. 1-38
Closed Access | Times Cited: 1
The performance of priority rules for the decentralized resource-constrained multi-project scheduling
Hongri Mao, Jianbo Yuan
Knowledge-Based Systems (2024), pp. 112530-112530
Closed Access
Hongri Mao, Jianbo Yuan
Knowledge-Based Systems (2024), pp. 112530-112530
Closed Access
Multi-objective optimization of work package scheme problem to minimize project carbon emissions and cost
Yaning Zhang, Xiao Li, Yue Teng, et al.
Computers & Industrial Engineering (2024), pp. 110831-110831
Closed Access
Yaning Zhang, Xiao Li, Yue Teng, et al.
Computers & Industrial Engineering (2024), pp. 110831-110831
Closed Access