OpenAlex Citation Counts

OpenAlex Citations Logo

OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!

If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.

Requested Article:

Integrated optimization and engineering application for disassembly line balancing problem with preventive maintenance
Yanqing Zeng, Zeqiang Zhang, Tengfei Wu, et al.
Engineering Applications of Artificial Intelligence (2023) Vol. 127, pp. 107416-107416
Closed Access | Times Cited: 10

Showing 10 citing articles:

Multi-objective disassembly line balancing and related supply chain management problems under uncertainty: Review and future trends
Junkai He, Feng Chu, Alexandre Dolgui, et al.
International Journal of Production Economics (2024) Vol. 272, pp. 109257-109257
Closed Access | Times Cited: 5

Modelling and optimization of line efficiency for preventive maintenance of robot disassembly line
Yanqing Zeng, Zeqiang Zhang, Yu Zhang, et al.
Journal of Manufacturing Systems (2025) Vol. 79, pp. 347-363
Closed Access

Integrating sustainability and quality orientation in the disassembly line balancing operations
Yiğit Kazançoğlu, Yücel Öztürkoğlu, P.R.S. Sarma, et al.
Management of Environmental Quality An International Journal (2025)
Closed Access

A multi-population cooperative coevolution artificial bee colony algorithm for partial multi-robotic disassembly line balancing problem considering preventive maintenance scenarios
Jun Guo, Yang Li, Baigang Du, et al.
Advanced Engineering Informatics (2024) Vol. 62, pp. 102750-102750
Closed Access | Times Cited: 4

A hybrid evolutionary algorithm for the stochastic human–robot collaborative disassembly line balancing problem considering carbon emission optimization
Tengfei Wu, Zeqiang Zhang, Lei Guo, et al.
Engineering Applications of Artificial Intelligence (2024) Vol. 135, pp. 108703-108703
Closed Access | Times Cited: 2

A multi-objective integrated scheduling of remanufacturing system considering time window constrained outsourcing option
Jun Guo, Weipeng Guo, Baigang Du, et al.
Journal of Cleaner Production (2024) Vol. 468, pp. 142916-142916
Closed Access | Times Cited: 1

Multi-objective preventive maintenance strategy and optimization considering unavailability and cost: A case study on VOBC
Cong Peng, Wei Shangguan, Jiali Peng, et al.
Alexandria Engineering Journal (2024) Vol. 105, pp. 567-577
Open Access

Exploring engineering applications of two-sided partial destructive disassembly line balancing problems under electrical limiting and time-of-use pricing
Lei Guo, Zeqiang Zhang, Yu Zhang, et al.
Expert Systems with Applications (2024), pp. 125573-125573
Closed Access

Hybridization of simulated annealing and D-numbers as a stochastic generator
Alireza Sotoudeh-Anvari, Seyed Mojtaba Sajadi
OPSEARCH (2024)
Closed Access

Integrated multi-manned disassembly line balancing problem with reverse supply chain design strategies by considering lot sizing
Elif Öksüz, Ömer Faruk Yılmaz, Mehmet Kürşat Öksüz, et al.
Journal of Industrial and Production Engineering (2024), pp. 1-24
Closed Access

Page 1

Scroll to top