
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
Flow shop scheduling problems with assembly operations: a review and new trends
G.M. Komaki, Shaya Sheikh, Behnam Malakooti
International Journal of Production Research (2018) Vol. 57, Iss. 10, pp. 2926-2955
Closed Access | Times Cited: 111
G.M. Komaki, Shaya Sheikh, Behnam Malakooti
International Journal of Production Research (2018) Vol. 57, Iss. 10, pp. 2926-2955
Closed Access | Times Cited: 111
Showing 26-50 of 111 citing articles:
Worker assignment in dual resource constrained assembly job shops with worker heterogeneity: an assessment by simulation
Matthias Thürer, Haiwen Zhang, Mark Stevenson, et al.
International Journal of Production Research (2019) Vol. 58, Iss. 20, pp. 6336-6349
Open Access | Times Cited: 29
Matthias Thürer, Haiwen Zhang, Mark Stevenson, et al.
International Journal of Production Research (2019) Vol. 58, Iss. 20, pp. 6336-6349
Open Access | Times Cited: 29
Multi-Stage assembly flow shop with setup time and release time
Shaya Sheikh, G.M. Komaki, Vahid Kayvanfar, et al.
Operations Research Perspectives (2019) Vol. 6, pp. 100111-100111
Open Access | Times Cited: 22
Shaya Sheikh, G.M. Komaki, Vahid Kayvanfar, et al.
Operations Research Perspectives (2019) Vol. 6, pp. 100111-100111
Open Access | Times Cited: 22
Real-time order acceptance and scheduling for data-enabled permutation flow shops: Bilevel interactive optimization with nonlinear integer programming
Wenchong Chen, Xuejian Gong, Humyun Fuad Rahman, et al.
Omega (2021) Vol. 105, pp. 102499-102499
Closed Access | Times Cited: 19
Wenchong Chen, Xuejian Gong, Humyun Fuad Rahman, et al.
Omega (2021) Vol. 105, pp. 102499-102499
Closed Access | Times Cited: 19
No-Wait Flow Shop scheduling problem: a systematic literature review and bibliometric analysis
Dana Marsetiya Utama, Sabila Zahra Umamy, Cynthia Novel Al-Imron
RAIRO - Operations Research (2024) Vol. 58, Iss. 2, pp. 1281-1313
Open Access | Times Cited: 2
Dana Marsetiya Utama, Sabila Zahra Umamy, Cynthia Novel Al-Imron
RAIRO - Operations Research (2024) Vol. 58, Iss. 2, pp. 1281-1313
Open Access | Times Cited: 2
Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
Zikai Zhang, Qiuhua Tang
Flexible Services and Manufacturing Journal (2021) Vol. 34, Iss. 1, pp. 156-203
Closed Access | Times Cited: 17
Zikai Zhang, Qiuhua Tang
Flexible Services and Manufacturing Journal (2021) Vol. 34, Iss. 1, pp. 156-203
Closed Access | Times Cited: 17
Flexible Job Shop Scheduling Problems with Arbitrary Precedence Graphs
Gregory A. Kasapidis, Dimitris C. Paraskevopoulos, Panagiotis P. Repoussis, et al.
Production and Operations Management (2021) Vol. 30, Iss. 11, pp. 4044-4068
Open Access | Times Cited: 17
Gregory A. Kasapidis, Dimitris C. Paraskevopoulos, Panagiotis P. Repoussis, et al.
Production and Operations Management (2021) Vol. 30, Iss. 11, pp. 4044-4068
Open Access | Times Cited: 17
Distributed assembly permutation flow shop problem; Single seekers society algorithm
Alper Hamzadayı, Mehmet Ali Arvas, Atabak Elmi
Journal of Manufacturing Systems (2021) Vol. 61, pp. 613-631
Closed Access | Times Cited: 17
Alper Hamzadayı, Mehmet Ali Arvas, Atabak Elmi
Journal of Manufacturing Systems (2021) Vol. 61, pp. 613-631
Closed Access | Times Cited: 17
Optimisation framework and method for solving the serial dual-shop collaborative scheduling problem
Lin Gui, Ling Fu, Xinyu Li, et al.
International Journal of Production Research (2022) Vol. 61, Iss. 13, pp. 4341-4357
Closed Access | Times Cited: 10
Lin Gui, Ling Fu, Xinyu Li, et al.
International Journal of Production Research (2022) Vol. 61, Iss. 13, pp. 4341-4357
Closed Access | Times Cited: 10
Anarchic manufacturing: implementing fully distributed control and planning in assembly
Andrew Ma, Aydin Nassehi, Chris Snider
Production & Manufacturing Research (2021) Vol. 9, Iss. 1, pp. 56-80
Open Access | Times Cited: 13
Andrew Ma, Aydin Nassehi, Chris Snider
Production & Manufacturing Research (2021) Vol. 9, Iss. 1, pp. 56-80
Open Access | Times Cited: 13
Mass personalization-oriented integrated optimization of production task splitting and scheduling in a multi-stage flexible assembly shop
Shibao Pang, Shunsheng Guo, Lei Wang, et al.
Computers & Industrial Engineering (2021) Vol. 162, pp. 107736-107736
Closed Access | Times Cited: 13
Shibao Pang, Shunsheng Guo, Lei Wang, et al.
Computers & Industrial Engineering (2021) Vol. 162, pp. 107736-107736
Closed Access | Times Cited: 13
Distributed Heterogeneous Co-Evolutionary Algorithm for Scheduling a Multistage Fine-Manufacturing System With Setup Constraints
Guanghui Zhang, Bo Liu, Ling Wang, et al.
IEEE Transactions on Cybernetics (2022) Vol. 54, Iss. 3, pp. 1497-1510
Closed Access | Times Cited: 9
Guanghui Zhang, Bo Liu, Ling Wang, et al.
IEEE Transactions on Cybernetics (2022) Vol. 54, Iss. 3, pp. 1497-1510
Closed Access | Times Cited: 9
Towards a Fuzzy Approach for Optimizing Single Machine Common Due Date Scheduling Problem under Uncertainty
Hamiden Abd El‐Wahed Khalifa, Robert S. Keyser
Journal of Operational and Strategic Analytics (2024) Vol. 2, Iss. 1, pp. 11-20
Open Access | Times Cited: 1
Hamiden Abd El‐Wahed Khalifa, Robert S. Keyser
Journal of Operational and Strategic Analytics (2024) Vol. 2, Iss. 1, pp. 11-20
Open Access | Times Cited: 1
A Bi-Objective Approach to Minimize Makespan and Energy Consumption in Flow Shops with Peak Demand Constraint
Weiwei Cui, Biao Lu
Sustainability (2020) Vol. 12, Iss. 10, pp. 4110-4110
Open Access | Times Cited: 13
Weiwei Cui, Biao Lu
Sustainability (2020) Vol. 12, Iss. 10, pp. 4110-4110
Open Access | Times Cited: 13
Managing Disruptions in a Flow-Shop Manufacturing System
Ajay S Bhongade, P. M. Khodke, Ateekh Ur Rehman, et al.
Mathematics (2023) Vol. 11, Iss. 7, pp. 1731-1731
Open Access | Times Cited: 4
Ajay S Bhongade, P. M. Khodke, Ateekh Ur Rehman, et al.
Mathematics (2023) Vol. 11, Iss. 7, pp. 1731-1731
Open Access | Times Cited: 4
The optimal configuration for various placement machines in PCB assembly lines
Tzu‐Li Chen, James C. Chen, Yin-Yann Chen, et al.
Annals of Operations Research (2024)
Closed Access | Times Cited: 1
Tzu‐Li Chen, James C. Chen, Yin-Yann Chen, et al.
Annals of Operations Research (2024)
Closed Access | Times Cited: 1
A Systematic Literature Review on No-Idle Flow Shop Scheduling Problem
Dana Marsetiya Utama, Cynthia Novel Al Imron
Operations Research Forum (2024) Vol. 5, Iss. 1
Closed Access | Times Cited: 1
Dana Marsetiya Utama, Cynthia Novel Al Imron
Operations Research Forum (2024) Vol. 5, Iss. 1
Closed Access | Times Cited: 1
A Review on Reinforcement Learning in Production Scheduling: An Inferential Perspective
Vladimír Modrák, R. Sudhakara Pandian, Arunmozhi Balamurugan, et al.
Algorithms (2024) Vol. 17, Iss. 8, pp. 343-343
Open Access | Times Cited: 1
Vladimír Modrák, R. Sudhakara Pandian, Arunmozhi Balamurugan, et al.
Algorithms (2024) Vol. 17, Iss. 8, pp. 343-343
Open Access | Times Cited: 1
Flow Shop Scheduling Problem
Magdalene Marinaki
Encyclopedia of Optimization (2024), pp. 1-11
Closed Access | Times Cited: 1
Magdalene Marinaki
Encyclopedia of Optimization (2024), pp. 1-11
Closed Access | Times Cited: 1
On the trade-offs between scheduling objectives for unpaced mixed-model assembly lines
Frederik Ferid Ostermeier
International Journal of Production Research (2020) Vol. 60, Iss. 3, pp. 866-893
Closed Access | Times Cited: 12
Frederik Ferid Ostermeier
International Journal of Production Research (2020) Vol. 60, Iss. 3, pp. 866-893
Closed Access | Times Cited: 12
Hybrid particle swarm optimization algorithm for scheduling flexible assembly systems with blocking and deadlock constraints
Xiaoling Li, Keyi Xing, Qing-Chang Lu
Engineering Applications of Artificial Intelligence (2021) Vol. 105, pp. 104411-104411
Closed Access | Times Cited: 11
Xiaoling Li, Keyi Xing, Qing-Chang Lu
Engineering Applications of Artificial Intelligence (2021) Vol. 105, pp. 104411-104411
Closed Access | Times Cited: 11
Advances in Adaptive Scheduling in Industry 4.0
Dimitris Mourtzis
Frontiers in Manufacturing Technology (2022) Vol. 2
Open Access | Times Cited: 7
Dimitris Mourtzis
Frontiers in Manufacturing Technology (2022) Vol. 2
Open Access | Times Cited: 7
A Multiobjective Optimization of PCB Prototyping Assembly With OFA Based on the Similarity of Intuitionistic Fuzzy Sets
Weibo Zhang, Guangyu Zhu
IEEE Transactions on Fuzzy Systems (2020) Vol. 29, Iss. 7, pp. 2054-2061
Open Access | Times Cited: 11
Weibo Zhang, Guangyu Zhu
IEEE Transactions on Fuzzy Systems (2020) Vol. 29, Iss. 7, pp. 2054-2061
Open Access | Times Cited: 11
Assembly flow shop scheduling problem considering machine eligibility restrictions and auxiliary resource constraints
Seyed Mohammad Hassan Hosseini, Shib Sankar Sana, Mohammad Rostami
International Journal of Systems Science Operations & Logistics (2021) Vol. 9, Iss. 4, pp. 512-528
Closed Access | Times Cited: 10
Seyed Mohammad Hassan Hosseini, Shib Sankar Sana, Mohammad Rostami
International Journal of Systems Science Operations & Logistics (2021) Vol. 9, Iss. 4, pp. 512-528
Closed Access | Times Cited: 10
Consideration of processing time dissimilarity in batch-cyclic scheduling of flowshop cells
Najat Almasarwah, Gürsel A. Süer
International Journal of Production Research (2020) Vol. 59, Iss. 21, pp. 6544-6563
Closed Access | Times Cited: 9
Najat Almasarwah, Gürsel A. Süer
International Journal of Production Research (2020) Vol. 59, Iss. 21, pp. 6544-6563
Closed Access | Times Cited: 9
Production scheduling problem with assembly flow shop systems: mathematical optimisation models
José Renatho da Silva Santana, Hélio Yochihiro Fuchigami
International Journal of Production Research (2023) Vol. 62, Iss. 7, pp. 2483-2498
Closed Access | Times Cited: 3
José Renatho da Silva Santana, Hélio Yochihiro Fuchigami
International Journal of Production Research (2023) Vol. 62, Iss. 7, pp. 2483-2498
Closed Access | Times Cited: 3