
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach
Mohamed Hussein, Amos Darko, Abdelrahman E. E. Eltoukhy, et al.
Journal of Construction Engineering and Management (2022) Vol. 148, Iss. 6
Closed Access | Times Cited: 40
Mohamed Hussein, Amos Darko, Abdelrahman E. E. Eltoukhy, et al.
Journal of Construction Engineering and Management (2022) Vol. 148, Iss. 6
Closed Access | Times Cited: 40
Showing 26-50 of 40 citing articles:
A Comprehensive Evaluation Model with TOPSIS Method for Construction Site Layout of Building Projects and Its Applications
Qiurui Liu, Ping Zhang, Lin Chen, et al.
Journal of Urban Planning and Development (2024) Vol. 150, Iss. 3
Closed Access | Times Cited: 1
Qiurui Liu, Ping Zhang, Lin Chen, et al.
Journal of Urban Planning and Development (2024) Vol. 150, Iss. 3
Closed Access | Times Cited: 1
Multi-Agent Simulation Approach for Modular Integrated Construction Supply Chain
Ali Attajer, Boubakeur Mecheri
Applied Sciences (2024) Vol. 14, Iss. 12, pp. 5286-5286
Open Access | Times Cited: 1
Ali Attajer, Boubakeur Mecheri
Applied Sciences (2024) Vol. 14, Iss. 12, pp. 5286-5286
Open Access | Times Cited: 1
Optimized transportation scheduling for precast concrete components considering heterogeneous vehicle-size matching
Huimin Liu, Shanshan Wang, Tao Yang, et al.
Advanced Engineering Informatics (2024) Vol. 62, pp. 102658-102658
Closed Access | Times Cited: 1
Huimin Liu, Shanshan Wang, Tao Yang, et al.
Advanced Engineering Informatics (2024) Vol. 62, pp. 102658-102658
Closed Access | Times Cited: 1
Data-driven logistics collaboration for prefabricated supply chain with multiple factories
Yishu Yang, Ying Yu, Chenglin Yu, et al.
Automation in Construction (2024) Vol. 168, pp. 105802-105802
Closed Access | Times Cited: 1
Yishu Yang, Ying Yu, Chenglin Yu, et al.
Automation in Construction (2024) Vol. 168, pp. 105802-105802
Closed Access | Times Cited: 1
Corporate Climate Pledges of High-Revenue Design Firms and Contractors
Nathalie Thelemaque, Jessica Kaminsky
Journal of Construction Engineering and Management (2023) Vol. 150, Iss. 2
Closed Access | Times Cited: 3
Nathalie Thelemaque, Jessica Kaminsky
Journal of Construction Engineering and Management (2023) Vol. 150, Iss. 2
Closed Access | Times Cited: 3
A Collaborative Planning Model for Offsite Construction Based on Virtual Reality and Game Engines
Mohamed Assaf, Rafik Lemouchi, Mohamed Al‐Hussein, et al.
Proceedings e report (2023), pp. 46-56
Closed Access | Times Cited: 2
Mohamed Assaf, Rafik Lemouchi, Mohamed Al‐Hussein, et al.
Proceedings e report (2023), pp. 46-56
Closed Access | Times Cited: 2
Simulating and optimizing precast wall lifting in prefabricated building construction
Zhenmin Yuan, Yuan Chang, Yunfeng Chen, et al.
Engineering Construction & Architectural Management (2022) Vol. 31, Iss. 6, pp. 2437-2456
Closed Access | Times Cited: 3
Zhenmin Yuan, Yuan Chang, Yunfeng Chen, et al.
Engineering Construction & Architectural Management (2022) Vol. 31, Iss. 6, pp. 2437-2456
Closed Access | Times Cited: 3
A REVIEW OF AGENT-BASED MODELING IN CONSTRUCTION MANAGEMENT: AN ANALYTICAL FRAMEWORK BASED ON MULTIPLE OBJECTIVES
Wenyao Liu, Qingfeng Meng, Hanhao Zhi, et al.
Journal of Civil Engineering and Management (2024) Vol. 30, Iss. 3, pp. 200-219
Open Access
Wenyao Liu, Qingfeng Meng, Hanhao Zhi, et al.
Journal of Civil Engineering and Management (2024) Vol. 30, Iss. 3, pp. 200-219
Open Access
Transportation-Induced Impact on a Prefinished Volumetric Modular House Using Trailer Bogie: Case Study
Seung Ho Song, Jin Ouk Choi, Hunhee Cho
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 7
Closed Access
Seung Ho Song, Jin Ouk Choi, Hunhee Cho
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 7
Closed Access
Shipment Planning Protocols in Cyber-Physical Internet for Modular Integrated Construction Logistics
Zhaolin Yuan, Zhiyuan Ouyang, Qiqi Chen, et al.
(2024)
Closed Access
Zhaolin Yuan, Zhiyuan Ouyang, Qiqi Chen, et al.
(2024)
Closed Access
Mixed Reality-Based Approach for Minimizing Time Uncertainty in Prefabrication
Helamini Sandagomika, Ankit Shringi, Saeed Reza Mohandes, et al.
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 11
Closed Access
Helamini Sandagomika, Ankit Shringi, Saeed Reza Mohandes, et al.
Journal of Construction Engineering and Management (2024) Vol. 150, Iss. 11
Closed Access
Integrated operation centers for storage and repair of imported precast modules
Huiwen Wang, Florence Yean Yng Ling, Wen Yi, et al.
Automation in Construction (2024) Vol. 168, pp. 105815-105815
Closed Access
Huiwen Wang, Florence Yean Yng Ling, Wen Yi, et al.
Automation in Construction (2024) Vol. 168, pp. 105815-105815
Closed Access
Two-Stage Stochastic Programming for Precast Module Water Transportation: A Case Study in Hong Kong
Huiwen Wang, Ying Terk Lim, Shenming Xie, et al.
Applied Sciences (2024) Vol. 14, Iss. 24, pp. 11987-11987
Open Access
Huiwen Wang, Ying Terk Lim, Shenming Xie, et al.
Applied Sciences (2024) Vol. 14, Iss. 24, pp. 11987-11987
Open Access
A Hybrid Simulation-Based Optimization Framework For Managing Modular Bridge Construction Projects: A Cable-Stayed Bridge Case Study
Mohamed Assaf, Sena Assaf, William Correa, et al.
2018 Winter Simulation Conference (WSC) (2023), pp. 3094-3105
Closed Access | Times Cited: 1
Mohamed Assaf, Sena Assaf, William Correa, et al.
2018 Winter Simulation Conference (WSC) (2023), pp. 3094-3105
Closed Access | Times Cited: 1
SÜRDÜRÜLEBİLİR LOJİSTİK ALT BİLEŞENLERİNİN TESPİTİ VE SÜRDÜRÜLEBİLİR LOJİSTİK BİLEŞENLERİNİN ETKİ DÜZEYLERİNİN DEMATEL YÖNTEMİ İLE BELİRLENMESİ
Onur Derse
Uluslararası Davranış Sürdürülebilirlik ve Yönetim Dergisi (2022)
Open Access | Times Cited: 2
Onur Derse
Uluslararası Davranış Sürdürülebilirlik ve Yönetim Dergisi (2022)
Open Access | Times Cited: 2
Optimisation of the Logistics System in an Electric Motor Assembly Flowshop by Integrating the Taguchi Approach and Discrete Event Simulation
Yongjian Jiang, Dongyun Wang, Wenjun Xia, et al.
Sustainability (2022) Vol. 14, Iss. 24, pp. 16770-16770
Open Access | Times Cited: 1
Yongjian Jiang, Dongyun Wang, Wenjun Xia, et al.
Sustainability (2022) Vol. 14, Iss. 24, pp. 16770-16770
Open Access | Times Cited: 1
A Collaborative Planning Model for Offsite Construction Based on Virtual Reality and Game Engines
Mohamed Assaf, Rafik Lemouchi, Mohamed Al‐Hussein, et al.
Proceedings e report (2023), pp. 46-56
Closed Access
Mohamed Assaf, Rafik Lemouchi, Mohamed Al‐Hussein, et al.
Proceedings e report (2023), pp. 46-56
Closed Access