
OpenAlex is a bibliographic catalogue of scientific papers, authors and institutions accessible in open access mode, named after the Library of Alexandria. It's citation coverage is excellent and I hope you will find utility in this listing of citing articles!
If you click the article title, you'll navigate to the article, as listed in CrossRef. If you click the Open Access links, you'll navigate to the "best Open Access location". Clicking the citation count will open this listing for that article. Lastly at the bottom of the page, you'll find basic pagination options.
Requested Article:
Agent-based modeling and simulation in construction
Ali Khodabandelu, JeeWoong Park
Automation in Construction (2021) Vol. 131, pp. 103882-103882
Closed Access | Times Cited: 74
Ali Khodabandelu, JeeWoong Park
Automation in Construction (2021) Vol. 131, pp. 103882-103882
Closed Access | Times Cited: 74
Showing 26-50 of 74 citing articles:
Two decades of agent-based modeling in marketing: a bibliometric analysis
Elena Romero, Manuel Chica, Sergio Damas, et al.
Progress in Artificial Intelligence (2023) Vol. 12, Iss. 3, pp. 213-229
Closed Access | Times Cited: 6
Elena Romero, Manuel Chica, Sergio Damas, et al.
Progress in Artificial Intelligence (2023) Vol. 12, Iss. 3, pp. 213-229
Closed Access | Times Cited: 6
A Study of the Foremen’s Influence on the Safety Behavior of Construction Workers Based on Cognitive Theory
Daniel Chukwunonso Nwagbala, Jong Yil Park
Buildings (2023) Vol. 13, Iss. 7, pp. 1792-1792
Open Access | Times Cited: 5
Daniel Chukwunonso Nwagbala, Jong Yil Park
Buildings (2023) Vol. 13, Iss. 7, pp. 1792-1792
Open Access | Times Cited: 5
Simulation-based comparison of push- and pull-based planning in panelized construction
Yuxi Wei, Zhen Lei, Mohammed Sadiq Altaf
Automation in Construction (2023) Vol. 158, pp. 105228-105228
Closed Access | Times Cited: 4
Yuxi Wei, Zhen Lei, Mohammed Sadiq Altaf
Automation in Construction (2023) Vol. 158, pp. 105228-105228
Closed Access | Times Cited: 4
Bi-level integration of discrete-event simulation (DES) and social force modeling (SFM) for construction labor productivity
Mahdi Naeimi Rad, Mojtaba Maghrebi
Automation in Construction (2024) Vol. 160, pp. 105317-105317
Closed Access | Times Cited: 1
Mahdi Naeimi Rad, Mojtaba Maghrebi
Automation in Construction (2024) Vol. 160, pp. 105317-105317
Closed Access | Times Cited: 1
Simulation Modeling Efforts in the Construction Industry: Integrated Application of BIM and Agent-Based Modeling
Kyudong Kim, Kasey M. Faust, Fernanda Leite
Computing in Civil Engineering (2024), pp. 509-516
Closed Access | Times Cited: 1
Kyudong Kim, Kasey M. Faust, Fernanda Leite
Computing in Civil Engineering (2024), pp. 509-516
Closed Access | Times Cited: 1
Merging Architectural Design and Robotic Planning using Interactive Agent-Based Modelling for Collective Robotic Construction
Samuel Leder, Achim Menges
Journal of Computational Design and Engineering (2024) Vol. 11, Iss. 2, pp. 253-268
Open Access | Times Cited: 1
Samuel Leder, Achim Menges
Journal of Computational Design and Engineering (2024) Vol. 11, Iss. 2, pp. 253-268
Open Access | Times Cited: 1
Technology adoption in the construction industry (1999–2023): Science mapping and visualization
Yasmine Elkhayat, Kareem Adel, Mohamed Marzouk
Automation in Construction (2024) Vol. 165, pp. 105491-105491
Closed Access | Times Cited: 1
Yasmine Elkhayat, Kareem Adel, Mohamed Marzouk
Automation in Construction (2024) Vol. 165, pp. 105491-105491
Closed Access | Times Cited: 1
Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites
Kamyab Aghajamali, Ala Nekouvaght Tak, Hosein Taghaddos, et al.
Journal of Construction Engineering and Management (2023) Vol. 149, Iss. 7
Closed Access | Times Cited: 4
Kamyab Aghajamali, Ala Nekouvaght Tak, Hosein Taghaddos, et al.
Journal of Construction Engineering and Management (2023) Vol. 149, Iss. 7
Closed Access | Times Cited: 4
Bibliometric analysis and visualization of sustainable infrastructure
Yasmine Elkhayat, Basma Mohamed, Mohamed El Zayat, et al.
Innovative Infrastructure Solutions (2023) Vol. 9, Iss. 1
Open Access | Times Cited: 4
Yasmine Elkhayat, Basma Mohamed, Mohamed El Zayat, et al.
Innovative Infrastructure Solutions (2023) Vol. 9, Iss. 1
Open Access | Times Cited: 4
Enhanced Gamma-Ray Attenuation-Based Detection System Using an Artificial Neural Network
Ehsan Eftekhari-Zadeh, Abdallah S. Bensalama, Gholam Hossein Roshani, et al.
Photonics (2022) Vol. 9, Iss. 6, pp. 382-382
Open Access | Times Cited: 6
Ehsan Eftekhari-Zadeh, Abdallah S. Bensalama, Gholam Hossein Roshani, et al.
Photonics (2022) Vol. 9, Iss. 6, pp. 382-382
Open Access | Times Cited: 6
Spatio-temporal deduction of floor construction based on the agent modeling of construction actors
Boda Liu, Bin Yang, Binghan Zhang, et al.
Automation in Construction (2022) Vol. 142, pp. 104487-104487
Closed Access | Times Cited: 4
Boda Liu, Bin Yang, Binghan Zhang, et al.
Automation in Construction (2022) Vol. 142, pp. 104487-104487
Closed Access | Times Cited: 4
Updating parameters of an information model for road construction flow in work development project
Т. В. Боброва
The Russian Automobile and Highway Industry Journal (2023) Vol. 19, Iss. 6, pp. 916-927
Open Access | Times Cited: 2
Т. В. Боброва
The Russian Automobile and Highway Industry Journal (2023) Vol. 19, Iss. 6, pp. 916-927
Open Access | Times Cited: 2
Integration of BIM and Computer Simulations in Modular Construction, A Case Study
Chengke Wu, Rui Jiang, Xiao Li
Modular and Offsite Construction (MOC) Summit Proceedings (2016)
Open Access | Times Cited: 4
Chengke Wu, Rui Jiang, Xiao Li
Modular and Offsite Construction (MOC) Summit Proceedings (2016)
Open Access | Times Cited: 4
Development levels for time planning model ofroad constru ction at design stages
Т. В. Боброва, E. A. Pokalyukhina
The Russian Automobile and Highway Industry Journal (2024) Vol. 20, Iss. 6, pp. 774-785
Open Access
Т. В. Боброва, E. A. Pokalyukhina
The Russian Automobile and Highway Industry Journal (2024) Vol. 20, Iss. 6, pp. 774-785
Open Access
Agent-Based Modeling for Delay Analysis Claims
Julia Said, Mariam Elazhary, Yasmeen A. S. Essawy, et al.
Lecture notes in civil engineering (2024), pp. 579-588
Closed Access
Julia Said, Mariam Elazhary, Yasmeen A. S. Essawy, et al.
Lecture notes in civil engineering (2024), pp. 579-588
Closed Access
A Generic Safety and Efficiency-Oriented Platform for Managing Equipment Operations on Construction Sites
Ali Khodabandelu, JeeWoong Park, U. Ray, et al.
Computing in Civil Engineering (2024), pp. 647-655
Closed Access
Ali Khodabandelu, JeeWoong Park, U. Ray, et al.
Computing in Civil Engineering (2024), pp. 647-655
Closed Access
Improving Multi-Crane Operations in Congested Urban Areas via Simulation of Overlapping Areas
Ali Khodabandelu, JeeWoong Park, Unmesa Ray, et al.
Computing in Civil Engineering (2024), pp. 275-282
Closed Access
Ali Khodabandelu, JeeWoong Park, Unmesa Ray, et al.
Computing in Civil Engineering (2024), pp. 275-282
Closed Access
Agent-Based Simulation of Multi-Crew Allocation to Scattered Repetitive Projects
Fam Saeed, Kareem Mostafa, M.A. Soliman, et al.
Construction Research Congress 2022 (2024), pp. 1220-1228
Closed Access
Fam Saeed, Kareem Mostafa, M.A. Soliman, et al.
Construction Research Congress 2022 (2024), pp. 1220-1228
Closed Access
Simulation Optimization Method for Intelligent Compaction Construction of Railway Subgrade Oriented Towards Quality Control
Zhaoxi Ma, Qin Zhao, Hongfei Jia, et al.
(2024)
Closed Access
Zhaoxi Ma, Qin Zhao, Hongfei Jia, et al.
(2024)
Closed Access
Simulation Optimization Method for Intelligent Compaction Construction of Railway Subgrade Oriented Towards Quality Control
Zhaoxi Ma, Qin Zhao, Hongfei Jia, et al.
(2024)
Closed Access
Zhaoxi Ma, Qin Zhao, Hongfei Jia, et al.
(2024)
Closed Access
Integrated Fuzzy System Dynamics–Fuzzy Agent-Based Modeling of Construction Crew Motivation and Productivity
Nebiyu Siraj Kedir, Aminah Robinson Fayek
(2024)
Closed Access
Nebiyu Siraj Kedir, Aminah Robinson Fayek
(2024)
Closed Access
Capítulo 7: Propuesta de un modelo computacional basado en agentes para un sistema productivo Lean Circular en el sector pesquero
Juan Carlos Muyulema Allaica, Jordán Antonio Lindao-Estupiñan, Kruger Iván Loor-Santana
(2024), pp. 179-204
Closed Access
Juan Carlos Muyulema Allaica, Jordán Antonio Lindao-Estupiñan, Kruger Iván Loor-Santana
(2024), pp. 179-204
Closed Access
Simulation Model for Project Management Enhancement in the Petroleum Industry
ElDawody Safinaz, N. Khaled, Essawy A. S. Yasmeen, et al.
Lecture notes in civil engineering (2024), pp. 31-43
Closed Access
ElDawody Safinaz, N. Khaled, Essawy A. S. Yasmeen, et al.
Lecture notes in civil engineering (2024), pp. 31-43
Closed Access
What Factors Influence Building Material Supply for Post-Disaster Reconstruction and Recovery? A Systematic Review Applying Systems Thinking
Kenan Liu, Alice Chang‐Richards, Seósamh B. Costello, et al.
International Journal of Disaster Risk Reduction (2024), pp. 104981-104981
Open Access
Kenan Liu, Alice Chang‐Richards, Seósamh B. Costello, et al.
International Journal of Disaster Risk Reduction (2024), pp. 104981-104981
Open Access